Its obvious to me that we made of very wise decision with Smith and Serverson as the general contractors on the job. now that everything is green light and structural issues addressed, things are moving at what seems like lightspeed to me (in comparison to the first 8 months of design hell). Roof has been supported and completely reengineered and interior walls are being framed out in incredible fashion. Finally after a year of imagining and dreaming about our floor plan, it is taking shape before my eyes. Smith anticipates their job done by the second week in october. only 2 months to go and at this rate, there is no doubt in our mind that their team is capable. Now Paul, Yury and I need to start working on the infrastucture and flow of this clinic and bring the dream to life. WVG South Bay open for business November 2014!!